Envisioning future of urban green and blue spaces in Nepal

The government of Nepal reported at least 224 deaths, 158 injuries, 28 missing persons due to severe flooding, including at

Comparing two coalition cultures: Case of Germany and Nepal

Germany’s coalition building functions very differently from the one in Nepal. After an election we have exploratory discussions, called Sondierungsgespräche

Climate change poses a threat to national security. What should Nepal do about it?

Most countries have finally realized the challenges posed by climate change to national, regional and global security. The justification for

A modest proposal for reviving Nepal’s economy

Mia, an abstract expressionist artist, walked through the vibrant streets of Mokum, to get inspired to create a new painting

COP29 |Climate activist Shreya KC explains what’s going wrong with the world and Nepal and what should be done

Over the last few months, I had a series of conversations with Shreya KC, one of the most prominent climate

Swollen Theule rivulet obstructs Kaligandaki corridor

Dhorpatan (Baglung): The continuous rain-triggered flood in the Theule rivulet has swept away the road, halting the Kaligandaki corridor. 

The flooded rivulet in Jaimini Municiplaity-1 of Baglung has fully obstructed vehicular movement to Muktinath, Butwal, Bhairahawa, Kapilvastu, and Dang. 

Information Officer at the Baglung District Police Office, DSP Bijaya Yadav, said that vehicles coming to Baglung Bazaar from various places of Jaimini Municipality such as Wainkuna, Zaidi, Chhishti, Arjewa and Binamare and Bareng rural municipalities have been stranded due to the blockade of the corridor. 

He said efforts would be made to open the corridor after the rain stops. The rain for the past few days has damaged the mid-hill highway, a national pride project. In particular, about 15 kilometers of road from Hatia of Galkot municipality-3 to Handikhola of Badigad rural municipality-2 has been damaged. The spokesperson of Galkot municipality, Him Bahadur Bhandari, however, said that the highway has come into operation after clearing the landslide debris.